← Back to building scores

RentSafeTO Q&A

How many Toronto apartment buildings score low on the cleaning log?

City of Toronto purpose-built rental buildings only. Scores are the City's official CURRENT BUILDING EVAL SCORE — this site does not recalculate them.

As of snapshot 2026-11-03, of 3,608 purpose-built rental buildings in the City of Toronto, Cleaning Log scored 0 on 40 buildings and 1 on 457 — 497 buildings in total, or 13.8% of the 3,608 buildings that were evaluated. 3,039 buildings scored the top rating of 3 and 0 were not evaluated.

These are City of Toronto RentSafeTO inspection scores, not counts of complaints or incidents. A 3 means the highest rating on the City's 0–3 scale; it does not mean this dimension has never had a problem.

Buildings scored 0 or 1 on Cleaning Log (20 listed)

Building addressScoreFlagDetails
15 GORE VALE AVE45Red flag
394 DOVERCOURT RD53Red flag
117 COSBURN AVE69Red flag
49 MC CAUL ST69Red flag
846-850 BROADVIEW AVE69Red flag
4 SHERBOURNE ST N70Yellow flag
25 DAVISVILLE AVE71Yellow flag
3464 YONGE ST71Yellow flag
376 BRUNSWICK AVE71Yellow flag
280 SAMMON AVE72Yellow flag
4160 BATHURST ST72Yellow flag
99 BELLEVUE AVE72Yellow flag
2 PROSPECT ST73Yellow flag
4033 OLD DUNDAS ST73Yellow flag
2868 KEELE ST75Yellow flag
1643 BLOOR ST W76Yellow flag
355 WESTMOUNT AVE78Yellow flag
1 A ELM GROVE AVE79Yellow flag
365 WESTMOUNT AVE80Yellow flag
111 ORIOLE PKWY81Yellow flag

Sorted by dimension score, then total score, then address. Only the first 20 buildings with a published detail page are listed; the City-wide count is in the answer above.

Questions and answers

What does the City evaluate under this dimension?

This is a paperwork dimension: whether the building keeps a cleaning log. The City's data key is CLEANING LOG; the dimension is rated cosmetic at a nominal 0.5% weight. Every figure on this page comes from the City's 0–3 ratings for this dimension.

How many buildings score low on this dimension?

Of 3,608 buildings, Cleaning Log scored 0 on 40 and 1 on 457 — 497 in total, or 13.8% of the 3,608 that were evaluated.

Does a 0 on this dimension mean a red flag?

No. The flag colour comes only from the City's CURRENT BUILDING EVAL SCORE across all dimensions (green ≥85, yellow 70–84.99, red <70); Cleaning Log is one dimension out of 50. In this snapshot 3,048 buildings are green-flagged, 536 yellow and 24 red. Read the single-dimension score together with the total.

How are buildings that were not evaluated counted?

Every one of the 3,608 buildings has an official score for this dimension; none is unevaluated.

Can I see the individual buildings?

Buildings with a published detail page list all 50 dimensions with their scores and evaluation date. 20 of them are listed above (out of 660 published pages), and the search page finds any address.

How often is the data updated, and how can I verify it?

The City republishes the dataset continuously; this site fetches the official open data at build time. Snapshot 2026-11-03; evaluation dates in the data range from 2023-08-15 to 2026-10-30. Every figure can be re-checked against the official dataset link at the bottom of the page (https://open.toronto.ca/dataset/apartment-building-evaluation/).

See the red-flag list · See the yellow-flag list · Back to building scores · Search a building · Methodology and data source · Do Toronto apartment buildings have pest records? · How are elevators scored in Toronto apartment buildings? · Which Toronto apartment buildings have the lowest scores? · Parking areas: how many buildings score low? · Interior hallway walls: how many buildings score low? · Building exterior: how many buildings score low? · Electrical safety plan: how many buildings score low? · Stairwell walls: how many buildings score low?

Snapshot 2026-11-03 · latest evaluation in the data 2026-10-30 · City of Toronto only · purpose-built rental only